1. <td id="ldq5v"></td>
    2. <track id="ldq5v"><strike id="ldq5v"></strike></track>
    3. CN

      Cutter type CNC lathe-36ZF (30 degree row machine)

      Model:HXCNC-36ZF

      Machine features:The overall layout of the rowing machine series is compact, with a small footprint and independent spindle unit. The temperature is low....

      Return List

      Product DescriptionFeaturesScope of ApplicationDetailed Description

      Processing range
      Maximum turning diameter                                 350MM
      Processing diameter (disc type)                          350MM
      Maximum processing diameter (shaft type)            34MM
      Maximum machining workpiece length                 100MM
      Maximum bar through hole diameter                     34MM
      stroke
      X-axis effective stroke (diameter)                       850MM

      Z axis effective stroke                                       220MM


      CNC數控車床_鴻軒數控CNC數控車床_鴻軒數控CNC數控車床_鴻軒數控數控排刀機_鴻軒數控數控排刀機_鴻軒數控數控設備生產廠家數控排刀機_鴻軒數控

      Processing range
      Maximum turning diameter                                      350MM
      Processing diameter (disc type)                               350MM
      Maximum processing diameter (shaft type)                34MM
      Maximum machining workpiece length                      100MM
      Maximum bar through hole diameter                        34MM
      stroke
      X-axis effective stroke (diameter)                            850MM
      Z axis effective stroke                                           220MM
      Spindle
      Spindle nose form                                                A2-4
      Spindle maximum speed                                        6000RPM
      Spindle through hole diameter                               46MM
      Spindle motor power                                            3.7KW/5.5KW
      Hydraulic chuck and rotary cylinder specifications       5 inch
      Feed
      Fast moving rate X/Z                                             24M/MIN
      X/Z axis servo motor                                             0.85KW
      Knife tower
      Turret specification
      Precision
      Positioning accuracy                                             ±0.005
      Repeat positioning accuracy                                  ±0.003
      size and weight
      Dimensions                                                        1900×1580×1800MM
      Weight                                                             2600KG
      Installation, commissioning, acceptance and training

      1. Preparation for installation

      1) Please ensure that the grounding foundation of the machine placement area is firm, large-scale machines need prefabricated cement foundation, and the foundation map will be notified separately.

      2) Please install the three-phase 380V, 50Hz power supply in advance, and ensure that the grounding is good. It is recommended to have a regulated power supply.

      3) Please ensure that there is no less than 0.6MPa air source and that the compressed air is dry and free of water.

      4) Please prepare the lubricating oil and chip liquid in advance. The guide rail oil specification is ISO VG68, and the optional spindle oil cooler is ISO VG10.

      5) Please ask the buyer to specify the operator and maintenance personnel of the machine, and assign special personnel to assist our company to install and debug the machine tool.
      1) Prepare the buyer for the requirements of Article 1 before installing and adjusting the work.

      2) Appearance inspection: Visual inspection of the appearance of the personnel of both buyers and sellers, tools and accessories shall be checked and accepted according to the contract and attachments.

      3) Performance and function acceptance: Acceptance according to the scope of supply of the machinery and controller determined by both parties.

      4) Mechanical precision acceptance: According to the accuracy inspection record provided by our company on the random factory certificate, the basis for acceptance is accepted.

      5) After the acceptance is completed, the buyer must immediately sign the “Installation Adjustment Test Invoice” in duplicate, and each party will keep one copy.

      3. Training

      Party B is responsible for technical training for Party A. The training time is 1-2 working days, and the training personnel are 1 to 5 people. The training location is in Party B, and training can also be conducted in Party A. The training includes machine structure, performance and function, CNC system, programming and operation, machine maintenance and other knowledge.
      TOP
      About Us
      Introduction
      Culture
      Architecture
      History
      Honor
      Products
      News
      Company News
      Technical Article
      Industry News
      Reputation
      Certificate
      Conditions
      Case
      Customer Case
      Customer Logo
      Service Centre
      Service Item
      Technical Support
      R&D
      Contact Us
      91香蕉国产线观看免|风间 一区二区 无码 有码|国产超爽精品国语对白|久久久久青草线综合超碰
      1. <td id="ldq5v"></td>
      2. <track id="ldq5v"><strike id="ldq5v"></strike></track>